Partner with MTLI on your next project todayBook a Call
Services/Installations/Steel Erection

Steel Erection Services

MTLI is a steel erection company that erects steel the way it installs everything else: certified crews, engineered lift plans, and a supervisor on every shift. Our structural steel erection projects include mezzanines, equipment platforms, catwalks, and structural packages, erected across Canada and the US.

10+50
Provinces & States Covered
0
Lost-Time Incident Target
24-72h
Mobilization SLA
98%
On-Time Completion

Building Stronger Structures Through Expert Steel Erection

Steel structures form an important part of industrial and commercial facilities, providing the framework for equipment platforms, mezzanines, access systems, and other operational spaces. Their successful installation depends on accurate positioning, suitable lifting methods, and coordination between different project teams.

MTLI delivers steel erection services across Canada and the US, working with general contractors, fabricators, and industrial clients. From individual structural components to larger steel packages, our certified crews follow engineered lift plans and project drawings to complete each stage of the erection process.

With site supervision, documented connections, and coordinated project management, MTLI supports structural installations in both new construction and active industrial environments. Our approach focuses on meeting project specifications while managing site conditions, safety requirements, and construction schedules.

Steel mezzanine frame with a crane, a beam on ground supports and supervisors reviewing the planned erection work
Why Choose Us

The MTLI Advantage

As an experienced ironwork company, MTLI brings coordinated crews, engineered planning, and on-site supervision to every project.

  • Certified erectors with engineered lift and rigging plans
  • Mezzanines, platforms, catwalks, and misc steel packages
  • Bolting, welding, and inspection to structural drawings
  • Live-facility erection with exclusion zones that protect operations
  • Erection for fabricators and GCs, or steel fabrication and erection through our ICI division
  • Site supervision and daily reporting on every project

Mezzanine Erection

Free-standing and rack-supported structures, decked and finished.

Platforms & Catwalks

Equipment platforms, crossovers, and access steel.

Structural Packages

Columns, beams, and bracing erected to engineered drawings.

Bolt-Up & Welding

Certified connections with documented torque and inspection.

Project Management

Sequencing with cranes, trades, and live operations.

Site Coverage

MTLI supervision and safety leadership on every shift.

What to Consider When Choosing a Steel Erection Company

Selecting the right steel erection company is an important decision for general contractors, fabricators, and facility owners. The provider should have the capabilities, equipment, and project coordination needed to manage the planned structural installation.

01

Relevant Project Experience

Review the provider's experience with structures similar to your project. Mezzanines, equipment platforms, catwalks, and larger structural packages can involve different lifting and installation requirements.

02

Qualified Crews and Site Supervision

Ask about the experience and qualifications of the erection crews. Consistent site supervision also helps coordinate daily activities, manage work areas, and address project requirements as they arise.

03

Engineered Lift Planning

Understand how the provider prepares lifting and rigging plans. These plans should account for component weights, crane requirements, lifting sequences, and exclusion zones, with engineering approval where required.

04

Connection and Inspection Capabilities

Confirm how bolted and welded connections are completed and inspected. The provider should understand the project's structural drawings and maintain the required records for review and handover.

05

Project Coordination

Steel erection often takes place alongside other construction activities. Look for a provider that can coordinate crane operations, trades, delivery schedules, and site access to support the overall construction sequence.

06

Scope of Services

Clarify whether you need erection-only support or a combined supply-and-erect arrangement. MTLI works with fabricators and GCs on erection projects and can also coordinate supply-and-erect delivery through its ICI division.

Challenges in Steel Erection and How We Manage Them

Steel erection projects can involve demanding site conditions, complex lifting requirements, and coordination challenges. Identifying these factors early helps establish a suitable plan for each stage of the installation.

Restricted Site Access

Limited access can affect crane positioning, steel deliveries, and the movement of lifting equipment. MTLI reviews site conditions and erection sequences to plan around available working space and access restrictions.

Heavy Structural Components

Large columns, beams, and other steel components require suitable lifting arrangements. The team reviews component weights and lifting requirements before selecting the cranes and rigging equipment needed for the operation.

Working Around Live Operations

Some erection projects take place inside active warehouses or industrial facilities. MTLI uses engineered exclusion zones, coordinated work schedules, and site supervision to manage erection activities around ongoing operations.

Tight Construction Schedules

Steel erection often needs to align with other trades and project milestones. Planning crane activities, crew availability, and installation sequences helps coordinate the work with the wider construction schedule.

Equipment Used in Structural Steel Erection

The equipment used during steel erection depends on component dimensions, load weights, site access, and the required installation sequence. Selecting suitable lifting and connection equipment helps crews position and secure structural components according to project specifications.

  • Cranes

    Used to lift and position structural steel components, including beams and columns. Crane selection depends on load requirements, lifting height, site access, and the planned erection sequence.

  • Rigging Equipment

    Slings, shackles, and other rigging components connect loads to lifting equipment. These are selected and arranged according to load characteristics and the engineered lift plan.

  • Access Equipment

    Supports crews carrying out bolting, welding, and inspection work at elevated positions. Selection depends on the structure, working height, and site conditions.

  • Bolting Tools

    Specialised tools tighten structural connections according to specified requirements. Documented torque checks help maintain records of completed bolted connections.

  • Welding Equipment

    Used to complete specified structural connections. Welds are inspected against project drawings, with documentation maintained for the engineer of record.

  • Lifting and Positioning Accessories

    Help crews guide and position steel components during installation. Selection depends on component design, connection details, and placement requirements.

Using the right equipment for each lifting and installation task helps MTLI maintain controlled operations, accurate steel positioning, and connections that meet project specifications.

Steel erectors using powered bolting equipment and reviewing drawings from a guarded scissor lift beside a beam connection

Industries That Require Steel Erection Services

Different industries depend on steel structures to support buildings, equipment, access systems, and operational spaces. MTLI provides steel erection services for projects across a range of industrial and commercial environments.

Manufacturing

Manufacturing facilities use steel structures for equipment platforms, production areas, mezzanines, and access systems. Erection work can support new installations, facility expansions, and operational upgrades.

Warehousing and Distribution

Warehouses often require mezzanines, access platforms, catwalks, and other structural components to support facility layouts. Steel erection helps install these structures according to the project's engineered requirements.

Automotive

Automotive facilities rely on structural steel for production areas, equipment support systems, and operational access. Planned erection supports machinery-related installations and facility modifications.

Commercial Construction

Commercial projects may include structural frameworks, access platforms, and other steel components. Coordinated installation helps align erection activities with the wider construction program.

Industrial Processing

Processing facilities use steel structures to support equipment, access routes, and operational infrastructure. Erection projects must account for machinery locations, available clearances, and surrounding site activities.

Our Process

How We Work

01

Drawing Review

We review the erection drawings, component weights, and planned installation sequences before work begins. This helps confirm project requirements and identify the resources needed for the erection process.

02

Lift Planning

We plan crane operations, rigging arrangements, and exclusion zones according to the project requirements. Engineered lift plans help establish the lifting methods and safety measures for each stage.

03

Mobilize

Our certified crews mobilize to project sites anywhere in North America. We coordinate site readiness, equipment, and crew requirements before starting the erection work.

04

Erect & Connect

Structural steel is lifted into position, then bolted and welded according to project specifications. Our crews follow the erection drawings and planned sequence throughout the installation.

05

Plumb & Inspect

We verify structural alignment and inspect connections against the project drawings. Bolted and welded connections are checked, with relevant inspection records maintained.

06

Turnover

Once erection is complete, the structure is decked, handrailed, and prepared for the next trade. Project documentation is also organized to support the handover process.

Success Story

24-Site Mezzanine Erection Program

"MTLI erected mezzanines across 24+ facilities in six months, every one inside a live operation. Their lift planning made our safety team's job easy."

, Program Director, E-Commerce & Manufacturing Client

Common Questions, Answered

Do you erect steel supplied by another fabricator?

Yes. Erection-only for fabricators and GCs is standard work, or supply-and-erect through our ICI construction division if you want one contract.

Can you erect inside a live warehouse?

That is most of our work: engineered exclusion zones, off-shift lifts, and sequencing that keeps your operation running under and around the work.

Are your connections inspected and documented?

Every bolted connection is torqued and every weld inspected to the structural drawings, with documentation handed over for your engineer of record.

What size steel packages do you take on?

From a single equipment platform to multi-site mezzanine programs: our largest erection program covered 24+ facilities in six months.

What factors affect the timeline of a steel erection project?

Project timelines depend on the size and complexity of the steel package, site conditions, material availability, crane access, and the erection sequence. Coordination with other trades and facility operations can also influence the schedule.

Can steel erection be carried out in phases?

Yes. Steel erection can be scheduled in phases to align with construction milestones, site readiness, and other trade activities. A planned sequence helps coordinate installation while managing access and work areas.

How do you ensure structural steel is installed accurately?

The erection team follows approved drawings and project specifications throughout installation. Alignment, connections, and positioning are checked during the process to help ensure the structure meets the required tolerances.

Do you provide steel erection for facility expansions?

Yes. Steel erection can support facility expansion projects involving additional structural components, equipment platforms, mezzanines, and access structures, depending on the project requirements.

What preparation is required before a steel erection project begins?

Preparation typically includes reviewing structural drawings, assessing site access, confirming lifting requirements, coordinating equipment and crew schedules, and establishing safety procedures before erection begins.

Can steel erection work be coordinated with other construction trades?

Yes. Steel erection activities can be coordinated with general contractors, fabricators, and other trades to align installation sequences, site access, and project milestones. This helps minimize scheduling conflicts and maintain workflow.

Ready to Get Started?

Choose a steel erection company that brings certified crews, engineered lift planning, and on-site supervision together. Contact our team today for a free consultation and customized quote.