Partner with MTLI on your next project todayBook a Call
Services/Installations/Racking Installation

Racking Installation

MTLI Group installs millions of pallet positions every year across North America. Our experienced crews handle every racking type, from simple selective systems to complex multi-deep and structural configurations, with precision workmanship and safety-first execution.

10M+
Positions Installed
500+
Projects/Year
All Types
Racking Systems
99%
On-Time Completion
Why Choose Us

The MTLI Advantage

  • Experienced crews specializing in all racking types
  • Manufacturer specification compliance on every install
  • Plumb, level, and square to tight tolerances
  • Full seismic anchoring and bracing where required
  • Minimal disruption to ongoing operations
  • Complete documentation and load signage

Selective Pallet Rack

Most common system, direct access to every pallet position. Single and double deep configurations.

Drive-In / Drive-Through

High-density systems for bulk storage. LIFO and FIFO configurations for palletized goods.

Push-Back Racking

Dynamic deep-lane storage with gravity flow. 2-6 deep positions per bay for medium SKU variety.

Cantilever Racking

Open-face storage for long and bulky items, lumber, pipe, furniture, and sheet goods.

Structural Steel Racking

Heavy-duty hot-rolled steel systems for extreme loads, seismic zones, and harsh environments.

Pallet Flow / Carton Flow

Gravity-fed FIFO systems for pick faces and replenishment. Ideal for date-sensitive products.

Our Process

How We Work

01

Pre-Installation Survey

Verify floor conditions, column locations, fire system clearances, and delivery access.

02

Material Staging

Receive, inspect, and stage all racking components for efficient installation.

03

Anchor Layout

Mark anchor points per engineering drawings, drill and set anchors.

04

Frame Erection

Install uprights, beams, and bracing to manufacturer specifications.

05

Accessories & Safety

Install wire decking, row spacers, column guards, and load signage.

06

Final Inspection

Quality check for plumb, level, square, and anchor torque. Documentation provided.

Success Story

2.5 Million SF Racking Installation, National Rollout

"MTLI installed racking across 8 of our facilities in a 12-month national rollout. Consistent quality at every site, on schedule, with zero safety incidents."

, VP of Distribution, National 3PL

Common Questions, Answered

Do you handle single sites or national rollouts?

Both. One installation or a coordinated national program with the same standards at every site. We have delivered mezzanine and conveyor programs across 24+ facilities in six months.

Whose crews do the work?

MTLI crews: in-house millwrights, electricians, and installers averaging 10+ years of experience, with an MTLI supervisor on site daily. Vetted trade partners fill specialty scopes under our supervision.

Can you meet aggressive schedules?

That is our reputation. We mobilize in days, run off-shift and weekend crews when needed, and deliver 98% of projects on or ahead of schedule.

What happens after installation?

Commissioning, punch list, and documentation, then warranty coverage and optional maintenance programs so the system keeps performing long after handover.

Ready to Get Started?

Contact our team today for a free consultation and customized quote.