Large DC Build-Outs
A million square feet of empty concrete becomes a shipping DC through thousands of coordinated installs. MTLI delivers large DC build-outs as one program: racking, conveyor, sortation, mezzanines, docks, and safety systems, one PM, one standard, one go-live.
The MTLI Advantage
- Every install scope under one program: no vendor stacking
- Program management with a single schedule and daily reporting
- Crews scale to hundreds across trades at peak
- Sequencing that lets racking, conveyor, and trades overlap safely
- Proven on the largest e-commerce and retail networks in North America
- Commissioning and punch driven to a clean day-one
Racking at Scale
Thousands of bays installed to survey and certified. Our teams handle large-scale racking installations with attention to layout specifications, alignment, structural requirements, and storage configurations to support high-capacity distribution operations.
Conveyor & Sortation
Full-building systems mechanically complete and rate-ready. We install conveyor and sortation infrastructure across large facilities, ensuring components are positioned according to approved layouts and system requirements to support efficient material movement.
Mezzanines & Platforms
Multi-level structures erected inside the build schedule. Our installation teams handle mezzanine and platform structures designed to utilize vertical facility space, accommodate operational requirements, and integrate with the surrounding warehouse infrastructure.
Docks & Safety
Every dock position and guardrail run in the same program. We install dock-related infrastructure, protective barriers, and guardrails to support organized loading areas, equipment movement, and safer working conditions throughout the facility.
Program Management
One master schedule across all scopes and trades. MTLI coordinates installation requirements across different work packages, maintaining visibility into project milestones, scope dependencies, and progress throughout large distribution center fit out.
Site Coverage
Supervision on every zone, every shift, with daily reporting. Dedicated site oversight helps monitor installation activities, address site-level requirements, and maintain visibility into work progress across different facility zones and active shifts.
Preparing Distribution Centers for Large-Scale Build-Outs
A successful distribution center build out starts with understanding the facility's physical conditions and infrastructure requirements. MTLI considers key site-readiness factors before installation begins to help identify potential constraints and prepare the building for large-scale equipment installation.
Structural Assessment
Evaluate the building's structural condition and suitability for the planned installation scope. Review floor load capacities, slab conditions, and other structural requirements to identify potential limitations before equipment installation begins.
Clearance Checks
Assess ceiling heights, overhead obstructions, and available clearances throughout the facility. These measurements help determine suitable locations for racking, mezzanines, conveyor systems, and other distribution center fit out infrastructure.
Utility Access
Review the availability and accessibility of electrical connections, utility points, and other essential building services. Understanding these requirements helps establish the infrastructure needed to accommodate the planned installation systems.
Equipment Access
Examine building entry points, unloading areas, access routes, and available equipment movement space. Proper access planning helps ensure that installation materials and machinery can reach their designated areas within the facility.
How We Work
Program Plan
Scopes, zones, and sequence built into one master schedule. Each installation requirement is mapped against project specifications, facility conditions, and key milestones to establish a clear execution framework. This provides a coordinated plan for every stage of the distribution center build-out.
Site Logistics
Laydown, receiving, and crew flow engineered for scale. We plan material staging areas, delivery access, equipment movement, and designated work zones to support large installation requirements. This helps maintain organized site operations throughout the project.
Structural First
Mezzanines, platforms, and support steel up front. Our installation teams prioritise structural components to establish the required foundations for subsequent equipment installations. This creates the necessary infrastructure for integrating storage and material handling systems.
Systems Install
Racking and conveyor waves run in parallel zones. Installation activities are organized across designated facility areas to accommodate multiple system requirements. This approach allows different installation scopes to progress simultaneously while maintaining their respective technical specifications.
Integration
Docks, safety, and finishing trades close to each zone. We complete the remaining infrastructure installations, including dock equipment, protective barriers, and related finishing requirements. Each area is checked against its designated scope to address outstanding installation items.
Commission & Go-Live
Zone-by-zone handover to a clean day-one. Completed installation areas move through final inspections, system verification, and outstanding-item resolution before handover. This structured approach helps prepare each zone for operational use and supports the facility's planned go-live requirements.
Maximizing Space Utilization Through Strategic DC Installations
Making the best use of available floor space is essential when developing a high-capacity distribution center. MTLI focuses on installation solutions that support organized storage, efficient product movement, and better utilization of the building's available footprint.
Vertical Storage
High-bay racking systems help businesses make better use of available vertical space instead of relying entirely on additional floor areas. Their installation can increase storage capacity while accommodating the facility's inventory and equipment requirements.
Aisle Planning
Proper aisle configurations provide the necessary space for material handling equipment, inventory access, and product movement. Racking placement and aisle dimensions should support the facility's storage requirements without unnecessarily limiting usable floor space.
Storage Density
Storage configurations should account for product dimensions, inventory volumes, and picking requirements. MTLI installs racking solutions that help businesses organize available storage areas while making better use of their existing building footprint.
Zone Allocation
Designated areas for receiving, storage, picking, packing, and shipping help maintain an organized facility layout. Strategic equipment placement allows each operational area to use its allocated space effectively without creating unnecessary congestion.

Consistent Distribution Center Buildouts Across Multiple Locations
Businesses expanding their distribution networks need consistent installation standards across every facility. MTLI supports multi-location distribution center build out projects with repeatable installation specifications, uniform quality expectations, and documented requirements that help maintain consistency across different sites.
Standard Specifications
Establish consistent installation specifications for racking, conveyor systems, mezzanines, and other infrastructure across multiple facilities. Standardized requirements help maintain uniform installation expectations regardless of the project's location or size.
Repeatable Layouts
Apply approved layout specifications and infrastructure requirements across facilities with similar operational needs. Repeatable installation standards help businesses maintain consistency while accommodating the individual building conditions of each distribution center.
Installation Benchmarks
Maintain consistent workmanship expectations and technical installation requirements across every project location. Common benchmarks help ensure that equipment installations follow the same approved specifications and quality expectations throughout the distribution network.
Regional Resources
Access to installation of resources across North America helps support projects involving multiple facilities and locations. MTLI can coordinate qualified installation teams based on regional project requirements and the resources needed at each site.
Project Documentation
Maintain consistent installation records, technical documentation, and facility-specific project information. Organized records give businesses a reliable reference for reviewing completed installations and managing infrastructure requirements across their distribution network.

Fulfillment Centre Build-Out
"MTLI built out our entire fulfillment centre: racking, conveyor, mezzanines, and docks on one schedule. Go-live hit the date we promised the network a year earlier."
, Launch Director, E-Commerce Operator
Quality Control Standards for Distribution Center Installations
Installation accuracy and workmanship directly affect the reliability of distribution center infrastructure. MTLI places emphasis on technical inspections and quality verification throughout the installation scope to help ensure that installed equipment meets approved specifications and project requirements.
Alignment Checks
Verify racking alignment, levelling, spacing, and dimensional accuracy against approved installation specifications. These checks help identify positioning inconsistencies that could affect the structural arrangement and intended use of storage systems.
Connection Inspections
Inspect structural connections, fasteners, anchors, and other critical installation components. Proper verification helps confirm that installed assemblies follow the applicable engineering requirements and manufacturer specifications.
Equipment Positioning
Check conveyor components, supports, and related equipment against approved drawings and installation tolerances. Accurate positioning helps ensure that individual components are installed according to the intended system configuration.
Specification Verification
Compare completed installations with approved drawings, equipment specifications, and project requirements. This verification helps identify discrepancies between the planned infrastructure and the installed systems before final acceptance.
Defect Resolution
Document identify installation deficiencies and track the corrective work required to address them. Resolving outstanding quality issues helps bring each installation scope in line with the agreed project specifications and acceptance requirements.

Related Services
Common Questions, Answered
Can one company really install everything in a new DC?
That is the entire point: racking, conveyor, sortation, mezzanines, docks, and safety systems under one program manager, one schedule, and one standard, so scopes never fall between vendors. This integrated approach reduces the need to coordinate multiple independent installation providers. It also gives businesses a consistent point of accountability across the entire distribution center installation.
How do you keep a million-square-foot build-out on schedule?
Zone-based sequencing: structural first, then parallel racking and conveyor waves, with supervision per zone and progress reported daily against the master schedule. Each work area follows defined installation requirements and project milestones to maintain visibility into progress. This approach also helps identify potential delays and address site-level constraints before they affect other installation activities.
What size crews can you field at peak?
Hundreds across trades when the schedule demands it, drawn from 250+ skilled techs and our vetted North American network. This workforce capacity supports large installation scopes involving multiple equipment types and facility zones. Crew resources can be adjusted to meet changing project demands and the installation requirements of individual sites.
Can you meet a fixed go-live date?
Fixed dates are the norm in this work: 98% on-time completion, and the flexibility to add shifts rather than move your date. Installation activities are aligned with key project milestones to help maintain the required completion timeline. Additional workforce resources and shift flexibility provide options when project demands increase or installation requirements change.
What should be assessed before starting a distribution center build out?
The facility's structural condition, floor load capacity, ceiling clearances, utility access, and equipment entry routes should be assessed. These factors help determine whether the building is ready for the planned installation requirements.
Why is floor load capacity important for distribution center installations?
Racking, mezzanines, stored inventory, and material handling equipment place different loads on a building's floor. Evaluating floor load capacity helps determine suitable installation configurations and identify structural requirements before work begins.
How can a distribution center maximize its available storage space?
High-bay racking, suitable aisle configurations, mezzanines, and organized storage zones can help maximize available space. The right installation approach depends on building dimensions, inventory requirements, and material handling needs.
What factors influence racking configurations in a large distribution center?
Building height, floor conditions, inventory dimensions, storage density, aisle requirements, and material handling equipment all influence racking configurations. These factors help determine an arrangement that suits the facility's operational requirements.
Can existing distribution centers be upgraded without rebuilding the entire facility?
Yes. Existing facilities can accommodate infrastructure upgrades such as additional racking, conveyor extensions, mezzanine installations, and equipment replacements. The appropriate scope depends on the building's existing conditions and expansion requirements.
What documentation should be maintained after a distribution center installation?
Installation records, inspection reports, approved drawings, equipment specifications, and corrective work documentation are useful project records. They provide facility operators with information for future inspections, maintenance, and infrastructure modifications.
Related Pages
Industries We Serve
Deep-Dive Guides
Ready to Get Started?
Contact our team today for a free consultation and customized quote.